Federal Center South

Description:

UMC, WSP, and Sellen Construction utilized Integrated Project Delivery (IPD) to deliver this 209,000 sq. ft. high-performance office building that has one of the nation’s lowest Energy Use Index, beating ASHRAE 90.1 energy efficiency standards by 40%.  The HVAC system includes geothermal, heat recovery chillers, phase change thermal storage, underfloor ventilation air, and chilled sails.

2013 Article from Contractor Magazine