Seattle Children’s Research Institute Olive Lab

Description:

The lab’s refrigeration systems were severely damaged because of improper repair, which caused repeated compressor failures. UMC Service retrofitted the existing AHU and replaced the refrigerant system. This option, while completely solving Olive Lab’s issues, was half the cost of purchasing and installing all new roof top equipment. The completed retrofit resulted in the building’s systems operating much more efficiently than before, as well as providing a more stable supply of air at the correct temperature.