Wheeler

Description:

Approximately 461,000 sq. ft. 63/20 financed project consisting of two office buildings to house the headquarters for the Washington State Department of Information Systems, as well as a new state data center that allows the state to consolidate older data centers into one efficient location. Project features include ~30,000 sq. ft. of white space. The ultimate build is ~60,000 sq. ft. of white space; 4.5 MW critical load. 9.0 MW ultimate build-out; Cooling system is air handlers with air-side economizer, direct evaporative cooling, and chilled water; Chiller plant uses high-efficiency variable-speed chillers and variable primary flow; UPS units have continuous-rated static switches, enabling 99% efficiency; Annual PUE projection is 1.25 to 1.45, depending on load.